ZAVCENTRE SUSTAINABILITY PROJECT
Brief description:
We need to install heat pumps, solar panels, and insulation to make ZavCentre (our guest house and hospitality centre, and OM in Belgium's main office and studio production) 90% self-suficient for energy.
Background information:
OM's first property, ZavCentre, has served the OM world since 1965. It burns gas for heating and uses grid electricity for power. It has been an aspiration to switch this to renewable energy for some time, as part of Creation Care. Sharply rising fuel costs make this an urgent necessity.
Fuel providers have informed us that costs will rise from €8000 for gas in 2022 to €24000 in 2023. Electricity is also expected to rise in price.
The base would normally expect to make €30000 a year which then goes into ministry. This would be entirely wiped out by the fuel prices' increase unless the building is made sustainable.
The base continues to play a significant role in serving missions worldwide as a conferencing and transition point, but it has taken on ever greater significance for evangelism and discipleship in least-reached Belgium. The construction of audio recording and broadcast video studios during Covid has enhanced this. It is now used for internet-based TV production by OM and by other Belgian ministries. It also provides the technological infrastructure for Bible translation for Flanders.
Financial breakdown:
Budgeted expenses | Item | Estimated cost | Notes | Updates |
---|---|---|---|---|
Phase 1 | ||||
Heat pump | €8,750.00 | Quote by supplier | Purchased on May 2023 at €8,230.00. Installed in June 2023. | |
Solar panels | €16,065.00 | Quote by supplier | ||
Roof preparation and insulation | €5,000.00 | Estimated on previous work | Done on May 2023. Thanks to wood donations, we spent €2,783.81 | |
Phase 2 | ||||
Roof preparation and insulation | €15,000.00 | Estimated on previous work | ||
Solar panels | €23,525.00 | Quote by supplier | ||
Heat pump | €15,000.00 | Waiting for proper quote | ||
Battery | €27,585.00 | Quote by supplier | ||
Total | €81,110.00 |
Tasks for the project:
Preparation of two roofs which will have solar panels
Preparation by OMers and volunteering teams.
Installation of insulation
Installation by OMers and volunteering teams.
Installation of 2 heat pumps
Commercial installation.
Installation of 78 solar panels
Commercial installation of panels and other requirements.
Connection of 1 battery
Connection of 1 battery (not included in solar panel price)
Critical funding
Critical funding need: Installation of insulation and placement on central roof (Phase 1, €29,815.00)
Critical amount: €29,815.00 or $32,500 in US dollars at the time of this conversion.
A €25 - €100 gift could... insulate 1 to 2 square meters of roof.
Top two capital items in the €500 to €2,000 range:
Pay for 1 - 2 solar panels.
Sustainability: a specific need that if met, would increase the long-term effectiveness or sustainability of the project:
Heat pump (€8,750.00) makes an immediate reduction on the heating costs and enables building income to be used toward project.
UPDATES
BANK TRANSFERS:
Operatie Mobilisatie
IBAN: BE55 3630 9189 8244
BIC: BBRUBEBB
When on your bank app, please write the name of the project you want to support on the subject line.
CREDIT CARDS: